As Duane Buziak explains, moving from a construction loan to a permanent mortgage is a handoff you can plan from day one. This guide takes you through it in order. You’ll finish knowing which structure fits your build, what lenders need at each stage, and how to hunt down your permanent rate before you close. Before you start, gather your land or contract details, the builder’s bid, and recent income and credit documents. At Mortgage Rate Hawk by Duane Buziak the philosophy is “We Don’t Just Look. We Hunt,” and the hunt for your permanent rate starts before groundbreaking, not at completion.

Step 1: Understand How the Construction Loan Hands Off to Your Permanent Mortgage

A construction loan is short-term, interim financing. The lender releases money in stages (called draws) as the builder hits milestones, and you pay interest only on what has been released. When the home is finished, a permanent mortgage replaces that short-term debt. It pays off the construction balance and starts the regular principal-and-interest payments you’d expect on any home loan.

There are two ways to structure that handoff:

Duane Buziak teaches one core rule: decide the exit before you break ground. The end-of-build mortgage is where surprise costs and rate risk hide. If you wait until the walls are up to think about it, you may be stuck with whatever pricing is available that week.

Lenders that sell loans to Fannie Mae follow its rules for construction-to-permanent and construction-conversion financing, which you can read in the Fannie Mae Selling Guide. For plain-language background on how mortgage costs and closings work, the CFPB’s mortgage resources are a reliable place to start. Guideline wording gets updated, so confirm current requirements with your loan officer rather than relying on any article, this one included.

Step 2: Choose Between One-Time Close and Two-Time Close

Neither structure is always cheaper. Each trades certainty against flexibility, and the comparison below shows how they differ as of 2026. Details vary by lender and program.

Feature One-Time Close Two-Time Close
Number of closings One Two
Rate lock timing Often locked up front, sometimes with a float-down or modification option Permanent rate set near completion
Appraisal and fee count Typically one set of closing costs, with a final inspection at conversion Two sets of closing costs, usually a new appraisal at the second closing
Flexibility to shop at completion Limited, since you are generally committed to the lender High, since you can compare current rates and programs
Credit and income re-verification Often limited at conversion, depending on the lender Full re-qualification at the second closing
Main risk Locking in a rate that later falls Rates or your finances worsening during the build

A one-time close gives you cost certainty and one closing. The tradeoff is less room to change lenders if the market moves in your favor. A two-time close adds a second round of fees, but it lets you hunt the current rate when the build ends. It also exposes you if rates climb or your income or credit changes in the meantime.

Use these rules of thumb:

Step 3: Pick the Loan Program That Fits Your Build

Duane Buziak offers Conventional, FHA, VA, and Jumbo options, but construction availability varies by lender and by lender overlays. Never assume a program works for a build until you’ve confirmed it for your specific scenario. As of 2026, the rules differ in ways that matter:

Don’t state the conforming limit from memory. Check the current figure at FHFA.gov for your county.

The most common mistake is assuming the lot purchase, land payoff, or owner-builder status will qualify the same way a finished-home purchase would. Owner-builder projects in particular face tighter limits, and many lenders won’t offer them at all. Tell your loan officer exactly how you own the land and who is building before you pick a program.

Step 4: Run the Numbers Before You Apply

Here is a worked illustration using Duane Buziak’s framework. It is hypothetical, not a quote, and uses made-up rates for 2026. Suppose you own a $90,000 lot in Georgia free and clear and plan an eight-month build costing $360,000. The total project is $450,000. If the lender counts your lot equity as the down payment (20%), your loan is $360,000.

Assume the construction phase carries an 8.00% interest-only rate, with draws released in four stages:

  1. Months 1 to 2: $72,000 drawn, interest of $480 per month.
  2. Months 3 to 4: $144,000 drawn, interest of $960 per month.
  3. Months 5 to 6: $252,000 drawn, interest of $1,680 per month.
  4. Months 7 to 8: $360,000 drawn, interest of $2,400 per month.

Total interest during the build is $11,040. Now add the costs people forget:

Your cash cushion beyond closing costs is about $55,640 ($11,040 + $17,600 + $27,000). After conversion, suppose the permanent mortgage is $360,000 at a hypothetical 6.50% on a 30-year term. Principal and interest comes to about $2,275 per month, before taxes and insurance.

The mistake to avoid is budgeting only that final payment. The draw-period payments rise month by month, and you’re paying for your current home at the same time.

Step 5: Line Up Your Builder, Plans, and Documents

Lenders typically review the builder’s license and experience, a signed construction contract, the plans and specifications, and a line-item cost breakdown. Gaps here are the most common cause of delay, so request these from your builder early.

The appraisal is based on those plans and specs and is marked “subject to completion,” meaning it estimates value as if the home were finished. If it comes in under cost, you generally have three choices: cover the gap in cash, renegotiate the contract or scope, or ask for a review with additional comparable sales. Lenders usually lend against the lower of appraised value or cost.

On your side, expect to provide:

Here’s a tip: Duane Buziak starts with a free no-touch credit check, so you see where you stand without a hard pull. If a score or a stray collection needs attention, you can fix it before it affects your pricing.

Step 6: Hunt the Rate and Lock It Strategically

Duane Buziak’s hunt approach is simple: Watch. Compare. Save. As a broker, he can compare wholesale options rather than offering one lender’s price. That’s a structural difference, not a promise of a lower rate on every loan, so always compare actual numbers.

Lock length is the hard part of a build. Construction takes months, and standard locks are much shorter. Ask each lender:

Other providers such as Rocket, Veterans United, Movement, and Lower are places borrowers commonly compare. Lower is worth credit for its digital application and pricing transparency. PowerTPO is Lower LLC’s own wholesale subsidiary, and Duane Buziak has direct PowerTPO access: the same underwriters, with no retail markup. That is a difference in channel, not a claim of a better rate, so let the numbers decide.

Request a Loan Estimate from each option and compare them line by line, including origination charges, lock extension terms, and cash to close. The CFPB’s Loan Estimate explainer walks through each section of the form.

Step 7: Manage Draws, Inspections, and the Conversion to Your Permanent Mortgage

During the build, an inspector verifies progress before each draw, and funds go to the builder in stages. You pay interest only on the amount released, which is why your payment rises as the house goes up.

Watch for change orders and delays. Each upgrade or schedule slip can eat into your contingency, and a long delay can run through your rate lock. Ask for written approval of any change and tell your loan officer before a lock expires, not after.

At completion, the lender will want a certificate of occupancy, a final inspection, and a final underwriting check. Keep your credit and employment stable until closing, and don’t open new debt, including furniture financing. Then work through this closing checklist:

  1. Title update confirming no new liens from unpaid subcontractors
  2. Final walkthrough with your builder
  3. Homeowners insurance in place and confirmed
  4. First permanent payment date confirmed in writing
  5. Payoff of the construction loan confirmed on your closing documents

Questions Borrowers Ask About Construction-to-Permanent Loans

1. How do I turn a construction loan into a permanent mortgage?

You either use a one-time close loan that converts automatically after the build, or you refinance into a new mortgage at completion with a two-time close. Both require a certificate of occupancy and a final check by the lender.

2. When should I lock my rate on a construction loan?

Ask about locking at closing on a one-time close loan, or near completion on a two-time close. Build length, extension costs, and float-down terms should drive the timing.

3. Is a one-time close always cheaper?

No. It usually means one set of closing costs, but you give up the ability to shop rates at completion. Compare both structures on a Loan Estimate.

4. Is the permanent rate always locked at the start?

No. Some one-time close loans lock up front, others use a modification or float-down, and two-time close loans set the rate later. Confirm the terms in writing.

5. What is a float-down option?

A float-down lets you take a lower market rate if rates fall after you lock. It typically costs a fee and has conditions, so ask what triggers it.

6. Do I pay principal during construction?

Generally no. Most construction loans are interest-only on the drawn balance. Principal payments begin once the permanent mortgage starts.

7. What is a subject-to-completion appraisal?

It is an appraisal based on plans and specifications that estimates the home’s value once finished. If it comes in under cost, you may need to pay the difference or revise the project.

8. Can I use FHA, VA, or Jumbo financing for a build?

Possibly, but construction availability varies by lender and overlays. Duane Buziak can check which options apply to your project as of 2026.

9. Can my finances change during the build?

You should avoid it. Lenders may re-verify credit and employment at conversion, so job changes or new debt can threaten your approval or pricing.

10. How much should I set aside as a contingency?

A common planning guideline is 5 to 10% of build cost, though this is a rule of thumb rather than a requirement. Your builder’s bid and the project’s risk should guide the number.

Before You Break Ground: The Last Three Things to Confirm

As the build nears completion, double-check three items: your rate lock expiration date, the final appraisal, and your homeowners insurance. A lapse in any one of them can delay or reprice your closing.

Your dream home is waiting, so don’t let the mortgage process hold you back. Get your free rate comparison and personalized loan match today, with same-day expert guidance to help you find the right path forward, whether you’re a first-time buyer or ready to refinance. You can also call Duane Buziak at 804-212-8663 or start a free no-touch credit check at Mortgage Rate Hawk by Duane Buziak. Duane Buziak, NMLS #1110647, is licensed in VA, FL, TN, GA, DC, NC, SC, and MD.