According to Duane Buziak, land loan plus construction financing comes down to one choice: fund the lot and the build in two separate steps, or fold both into a single loan that converts to a regular mortgage when the house is finished. That choice sets how much cash you need up front, how long your permanent rate stays exposed to the market, and whether you qualify once or twice. A lot is not financed like a finished home, and a builder’s contract is not a mortgage application, so the order of operations matters more than most first-time builders expect. At Mortgage Rate Hawk by Duane Buziak, the approach is “We Don’t Just Look. We Hunt.” The goal is to put the structures next to each other for your specific lot and budget before you commit to one.
Duane Buziak Explains the Two Ways to Finance Land and a Build
The first path is sequential. You buy the lot with a land loan (or cash), then later take a separate construction loan to build. That means two closings, two sets of closing costs, and a second round of qualification, because your income, credit, and the builder’s plans are all reviewed again when the construction loan is underwritten. If rates or your finances change between the two, the second step can look very different from what you planned.
The second path is a single-close construction-to-permanent loan. The lot (already owned or being purchased) and the build costs go into one loan. During construction you pay interest only. When the home is complete and inspected, the loan converts to a standard mortgage without a second closing.
A few terms keep the rest of this article clear:
- Raw land: a parcel with no utilities, road access, or permits in place.
- Improved lot: a parcel with utilities, road access, and permits or approvals that make it buildable.
- Interim interest-only period: the build phase, when you pay interest only on money already released.
- Conversion: the point where the construction loan becomes permanent financing.
- Permanent financing: the long-term mortgage, typically a 15- or 30-year term, you carry once you move in.
The most common misconception is that a lot can be financed like a house. It cannot. A land loan is its own product with its own rules, and treating it like a mortgage on a finished home is how buyers end up short on cash at the worst moment.
How Lenders Treat Land Loans and Why They Cost More
Lenders sort land into rough categories, and each one changes the terms. Raw or unimproved land carries the most scrutiny and usually the largest down payment. An improved lot, with utilities, access, and permits in place, is easier to underwrite because the path to a finished home is clearer. Exact requirements vary by lender and by loan program, so treat any percentage you hear as a starting point, not a rule.
The reason is collateral. A house can be lived in, rented, or sold to a wide pool of buyers. A vacant lot cannot be lived in, and if the borrower defaults the lender is left with an asset that can take a long time to sell. Lenders price that risk in. Expect a larger down payment, a higher rate, and often a shorter term than on a home loan, sometimes with a balloon payment.
A mistake to flag: assuming FHA, VA, or conventional programs will finance a standalone lot. Those programs are built around homes, not vacant land. Before you plan around any of them, ask Duane to verify the current program rules for your situation.
If you already own the lot free and clear, the picture improves. Its value can often count toward your equity in a construction loan, which can cover some or all of the down payment. Guidelines vary by lender, and an appraisal drives the number, so the lot is credited at appraised value, not necessarily at what you paid. A parcel you bought years ago may be worth more or less today.
For general background on how construction loans differ from standard mortgages, the Consumer Financial Protection Bureau publishes plain-language homebuying guidance.
How Construction Draws, Interest, and Inspections Work
The sequence for a typical construction loan runs like this:
- The lender reviews and approves your plans, your builder, and the cost breakdown.
- You close on the loan.
- The builder starts work, and the lender releases money in stages according to a draw schedule (foundation, framing, mechanicals, and so on).
- An inspector verifies the work before each release.
- A final inspection confirms completion.
- The loan converts to permanent financing, or in a two-close setup you close on the separate mortgage.
You do not pay full mortgage payments during the build. You pay interest only on what has been drawn so far, so the payment climbs as the project advances. Suppose a $360,000 construction loan carries an illustrative 7.00% rate. When $180,000 has been drawn, monthly interest is about $1,050. Once the full $360,000 is out, it is about $2,100. Budget for that rise, plus rent or a current mortgage payment if you are living elsewhere.
Builder requirements
Lenders typically want a licensed, insured builder, a signed contract, full plans and specifications, and an itemized cost breakdown. Requirements differ, and some lenders also review the builder’s track record or financial standing. Confirm each lender’s list early, because a missing document is the most common cause of delay.
Overruns and the appraisal gap
The budget is not fixed. Material prices move, site conditions surprise people, and you will probably change something mid-build. Plan a contingency cushion, commonly discussed as a percentage of hard costs, and decide in advance whether it sits in the loan or in your savings. The lender lends against the appraised “as completed” value. If total costs climb past what the appraisal supports, the shortfall generally comes out of your pocket. For consumer-level explanations of how these loans work, check the current construction-loan resources on CFPB.gov.
Comparing Your Options Side by Side
Here is how the three common structures compare. Details vary by lender and program, so use this as a framework for questions, not a promise of terms.
| Feature | Land loan, then separate construction loan (two-close) | One-time-close construction-to-permanent | Owned lot with a construction loan |
|---|---|---|---|
| Number of closings | Two or more (lot, then construction, then often the permanent mortgage) | One | One (or two if the construction loan and permanent mortgage are separate) |
| Down payment pattern | Cash or large down payment on the lot first, then equity required again for the build | One down payment on the combined project cost | Lot equity may cover part or all of the required down payment, subject to appraisal |
| Rate lock timing | Permanent rate set later; can move before you lock | Can often lock at the start, sometimes with a float-down option | Depends on structure; one-close allows an early lock |
| Qualification checkpoints | At least two full reviews | One review at closing, plus inspections during the build | One review for the build loan |
| Best-fit situation | You want to buy the lot now and build years later | You are buying the lot and building soon and want rate certainty | You already own the lot, especially free and clear |
The rate-lock tradeoff is the biggest practical difference. In a two-close plan, the permanent rate is set after the house is built, so you carry market risk for the whole build. A one-close loan lets you lock earlier, and some lenders offer a float-down that lets you capture a lower rate if the market improves. That option may cost extra, so ask for the price in writing. Lock periods that cover a long build can also carry extension fees.
Duane Buziak works as a broker, comparing options across hundreds of wholesale lenders so you see a side-by-side quote, not a single-lender pitch. That is the “Watch. Compare. Save.” idea applied to construction. Names like Rocket, Veterans United, Movement, and Lower come up in borrower research, but construction product availability changes by lender, state, and year, so confirm it directly rather than assuming. On Lower specifically, PowerTPO is Lower LLC’s own wholesale subsidiary. Lower’s digital application and pricing transparency are real strengths, and Duane’s direct PowerTPO access means working with the same underwriters without a retail layer. That is a difference in how you reach the product, not a claim about better rates.
VA construction financing is limited among lenders and must be confirmed lender by lender, so do not plan around it until it is verified. If VA is on the table, Duane can pull your Certificate of Eligibility electronically with your SSN and date of birth. He will also check any second-tier (bonus) entitlement: the county loan limit times 25% is the maximum guarantee, you subtract entitlement already used, and four times what remains sets the zero-down purchase limit.
A Fully Worked Example: Lot Plus Build in One Plan
Duane Buziak’s framework has three steps: total project cost, cash needed at each stage, then the payment at conversion. Every number below is an illustrative 2026 assumption for a Tennessee buyer, not a quote or a rate offer.
Total project cost: lot $90,000 plus build $360,000 equals $450,000. Assume a conventional-style structure requiring 20% equity, or $90,000, with a loan of $360,000.
Version A: you already own the lot
The lot appraises at $90,000 and is owned free and clear, so that equity covers the full $90,000 requirement. Cash needed for the down payment is $0, though closing costs and a contingency fund still apply. The loan is $360,000.
Version B: you buy the lot first
Suppose a land lender requires 50% down on the $90,000 lot. That is $45,000 in cash, with a $45,000 land loan. When you later take the construction loan, the lot equity is only $45,000 (value minus the balance owed), so you need another $45,000 in cash to reach the $90,000 requirement. Total cash for equity is still $90,000, but it arrives in two stages, with two sets of closing costs and two qualifications. The final loan is again $360,000.
Payments
- During the build: at an assumed 7.00% interim rate, interest-only runs from near $0 at the start to about $2,100 per month with the full $360,000 drawn.
- At conversion: at an assumed 6.25% on a 30-year term, principal and interest on $360,000 is about $2,217 per month.
- One point higher: at 7.25%, the payment is about $2,456, roughly $239 more each month, or about $2,868 per year. That is the cost of leaving the permanent rate unlocked through a build.
Check the loan-size ceiling before assuming conventional terms apply. FHFA sets conforming loan limits annually, and as of 2026 the baseline one-unit limit is $832,750, but verify the current figure and any higher high-cost-area limit on FHFA.gov. A project above your county’s limit moves into jumbo territory with different rules. For construction-to-permanent underwriting standards, see the Fannie Mae Selling Guide, and for FHA one-time-close availability, check HUD.gov, since lender participation varies.
Duane Buziak Teaches How to Hunt for the Right Setup
- Price the whole project first. Add the lot, site work (clearing, grading, septic or sewer, well or water), the build, permits, utility hookups, and a contingency. A lender can only compare structures against a real number.
- Check where you stand. Duane offers a free no-touch credit check, which lets you see your position without a hard inquiry. Then request quotes for the same project scenario so the comparison is fair.
- Ask each lender the same specific questions: single or two closes, rate-lock length, extension fees, draw fees, how the appraisal is done, and the minimum down payment.
- Line up builder paperwork early. License, insurance, contract, plans, and the cost breakdown. Delays here slow approval more than anything on the borrower side.
- Confirm the property location. Duane Buziak is licensed in VA, FL, TN, GA, DC, NC, SC, and MD. If your lot is in one of those, use the same-day call-back to get a side-by-side comparison.
Ten Questions Builders Ask About Land and Construction Loans
Can I get a land loan and construction loan together?
Yes, a single-close construction-to-permanent loan can cover the lot purchase and the build in one package. Availability depends on the lender, the lot, and your state, and a standalone land loan followed by a separate construction loan is the alternative.
How much down payment do I need for land?
Standalone land typically needs a larger down payment than a home, and raw land often needs more than an improved lot. The exact percentage varies by lender, so ask for it in writing.
Does the land I already own count toward my down payment?
Often yes. Lot equity can count toward the equity requirement on a construction loan, but the appraised value drives the figure, and any balance owed on the lot reduces it.
How do I compare construction-to-permanent loans if I already own the land?
Compare them on the same project scenario: closing count, rate-lock length, float-down cost, extension fees, draw fees, and minimum equity. A broker can run these across wholesale programs side by side.
When do I lock my interest rate?
With a one-close loan you can often lock at the start of the build, sometimes with a float-down. With a two-close plan the permanent rate is set later and can move in the meantime.
How do construction draws work?
The lender releases funds in stages tied to completed work, after an inspection verifies each stage. You pay interest only on the amount drawn.
What do lenders require from a builder?
Typically a license, insurance, a signed contract, plans, and a cost breakdown. Requirements differ by lender, so confirm the list before you sign with a builder.
What credit score do I need?
Construction loans are often underwritten more tightly than standard purchase loans, so a stronger score usually helps with approval and pricing. Minimums depend on the program and lender, and a no-touch credit check shows where you stand.
How long does the whole process take?
Approval and closing can take longer than a standard purchase because plans, builder, and costs are all reviewed. The build itself often runs many months, and conversion follows the final inspection.
Can I use a VA, FHA, or conventional loan to buy only the lot?
Generally not, because those programs are built around homes, not vacant land. Verify current rules with Duane before planning around any of them.
Own the Lot or Not: How to Decide and What to Do Next
The right choice depends on two things: whether you already own the lot, and how much rate risk you can carry during the build. If you own it, a construction loan using your lot equity is usually the cleanest start. If you are buying it, a single-close loan limits closings and lets you lock earlier, while a two-close plan fits a build that is years away. Call Mortgage Rate Hawk by Duane Buziak at 804-212-8663 for a side-by-side comparison of your project.